Waste Water Treatment
At full capacity the design of the
wastewater treatment plant at the park is capable of treating 20 million
gallons of wastewater per day. In its
current condition, only rainwater is processed through the system at about 3
million gallons per day. We have receved the approval of an
amendment to our current permit which will allow the park to
receive all kinds of waste from on and off-site sources. The treated wastewater is discharged through
a 42-inch line which sits in a 13.1 mile long easement owned by the park to the
Houston Ship Channel. This allows for
discharge limits much greater than are available anywhere else. Click on the PDF below for more details.